The evaporator for pharmaceutical wastewater is mainly used to treat industrial saline wastewater through a multi effect evaporation process. Its working principle mainly includes the following steps:
1. Heating and evaporation: The heater inside the evaporator heats the wastewater to quickly evaporate. During the evaporation process, the water in the heated wastewater is separated to form water vapor.
2. Condensation: The evaporated water vapor condenses into water in the condenser, which transfers heat from the water vapor to the water, allowing it to be reused for evaporation.
3. Multi effect evaporation: Through the cascade action of multiple evaporators and condensers, multiple evaporation and condensation of wastewater can be achieved, thereby improving the concentration of the solution.
4. MVR evaporation technology: MVR (mechanical steam re compression) evaporation technology is an efficient and energy-saving technology. It compresses and heats the secondary steam generated during the evaporation process through a compressor, increasing its temperature and pressure, and then uses it as a heat source again for the evaporation process, thereby reducing the demand for external energy.
5. Separation and recovery: During the evaporation process, inorganic salts and some organic matter can be separated by crystallization, and these substances can be recycled and reused. Desalinated water (which may contain trace amounts of low boiling organic matter) can be returned to the production system to replace softened water for utilization.
SCOPE OF WORK
Mechanical and Fabrication guarantee
Design including strength calculation (including erection condition) stress analysis and detail design based on applicable Codes, Local Regulation, Project Specifications and Standards
Thermal Design (Thermal Rating)
All technical certifications required for design work as per local regulations
Stability check (during transport, lifting and hydrostatic test) and loading data for base design
Structural analysis for main body and its support for operation load
Material procurement
Material Test and Certificates as per applicable Code and Specifications
Manufacturing
Post weld heat treatment as per code and specification
PMI (Positive Material Identification)
All NDEs as per Project Specification
Welding procedure qualification test
WPS & PQR
Welder performance test
Hydrostatic test at BlDDER shop as per Code & Local Regulations, Specifications.
Installation work for vessel internals supplied by Bidder
External surface preparation and painting as per Specification
Packing and marking as per project specificationsPreservation during transportation and storage (Including Seaworthy packing for oversea manufacturer)
Internal protection from moisture: N2 Charge
All activities to meet requirements of Data Sheets, Specifications, Codes and Standards, Local Regulations
![Pharmaceutical Wastewater Evaporator GOST Evaporation Crystallizer Cooling Crystallizer](//www.micstatic.com/athena/img/transparent.png)
![Pharmaceutical Wastewater Evaporator GOST Evaporation Crystallizer Cooling Crystallizer](//www.micstatic.com/athena/img/transparent.png)
![Pharmaceutical Wastewater Evaporator GOST Evaporation Crystallizer Cooling Crystallizer](//www.micstatic.com/athena/img/transparent.png)
![Pharmaceutical Wastewater Evaporator GOST Evaporation Crystallizer Cooling Crystallizer](//www.micstatic.com/athena/img/transparent.png)
![Pharmaceutical Wastewater Evaporator GOST Evaporation Crystallizer Cooling Crystallizer](//www.micstatic.com/athena/img/transparent.png)
![Pharmaceutical Wastewater Evaporator GOST Evaporation Crystallizer Cooling Crystallizer](//www.micstatic.com/athena/img/transparent.png)
1. Q:Are you a manufacturer or trading company?
A:We are a manufacturer with over thirty years of experience in China.
2.Q:Can we visit your factory before placing orders?
A: Sure, warmly welcome to our factory!
3.Q:What's the information needed if I send one inquiry ?
A : Please tell us the working conditions, mediums,temperature ,pressure, equipment ' s material,size,quantity, and other special requests.
4.Q:How does your factory do quality control?
A: Quality is priority ,we make relevant strict testing before delivery.
Our factory has already obtained ASME, GOST, ISO9001 quality and ISO 14001 Environmental management system certificate.