The cylinder is a steam water separation device. Usually, its use relies on the principles of natural separation and mechanical separation, where natural separation utilizes the density difference between steam and water. Under the action of gravity, the slower the rising speed of steam in the drum and the longer the residence time, the better the result of natural separation. In fact, when using separate cylinders, in addition to the principle of gravity separation, the three principles of centrifugal separation, inertial separation, and water film separation are also used, specifically:
(1) Inertial separation: Separation is achieved by utilizing the inertial force generated when changing the flow direction of a steam water mixture;
(2) Centrifuge separation: Using a mixture of soda and water, the centrifugal force generated during rotation is used for separation;(3) Water film separation: The water droplets in the mixture of soda water and water adhere to the metal wall, forming a water film that flows downwards and separates.
SCOPE OF WORK
Mechanical and Fabrication guarantee
Design including strength calculation (including erection condition) stress analysis and detail design based on applicable Codes, Local Regulation, Project Specifications and Standards
Thermal Design (Thermal Rating)
All technical certifications required for design work as per local regulations
Stability check (during transport, lifting and hydrostatic test) and loading data for base design
Structural analysis for main body and its support for operation load
Material procurement
Material Test and Certificates as per applicable Code and Specifications
Manufacturing
Post weld heat treatment as per code and specification
PMI (Positive Material Identification)
All NDEs as per Project Specification
Welding procedure qualification test
WPS & PQR
Welder performance test
Hydrostatic test at BlDDER shop as per Code & Local Regulations, Specifications.
Local Regulations, Specifications.
Installation work for vessel internals supplied by Bidder
External surface preparation and painting as per Specification
Packing and marking as per project specifications
Preservation during transportation and storage (Including Seaworthy packing for oversea manufacturer)
Internal protection from moisture: N2 Charge
All activities to meet requirements of Data Sheets, Specifications, Codes and Standards, Local Regulations