Customization: | Available |
---|---|
After-sales Service: | Repairable Within The Warranty Period |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The classification purposes of chemical tail gas recovery tanks mainly include tail gas collection, purification, storage, reuse, and emission functions, aiming to protect the environment, improve resource utilization efficiency, and ensure production safety.
1. Classification based on working principles:
-Adsorption type tail gas recovery tank: uses adsorbent to adsorb harmful substances in the exhaust gas and release clean gas into the atmosphere.
-Condensation type tail gas recovery tank: By reducing the temperature of the exhaust gas, harmful substances in the exhaust gas are condensed into liquids, and then liquid waste is collected and treated.
-Adsorption condensation composite exhaust gas recovery tank: Combining the principles of adsorption and condensation, it can more efficiently recover and treat exhaust gas.
2. Classification by application field:
-Petrochemical tail gas recovery tank: mainly used in the petrochemical industry to recover and treat waste gas generated in processes such as refining, fertilizer, and synthetic resin.
-Electronic chemical tail gas recovery tank: mainly used in the electronics industry to recover and treat harmful gases generated in semiconductor manufacturing, electronic assembly, and other processes.
-Pharmaceutical and chemical tail gas recovery tank: mainly used in the pharmaceutical industry to recover and treat waste gas generated during drug production.
SCOPE OF WORK
Mechanical and Fabrication guarantee
Design including strength calculation (including erection condition) stress analysis and detail design based on applicable Codes, Local Regulation, Project Specifications and Standards
Thermal Design (Thermal Rating)
All technical certifications required for design work as per local regulations
Stability check (during transport, lifting and hydrostatic test) and loading data for base design
Structural analysis for main body and its support for operation load
Material procurement
Material Test and Certificates as per applicable Code and Specifications
Manufacturing
Post weld heat treatment as per code and specification
PMI (Positive Material Identification)
All NDEs as per Project Specification
Welding procedure qualification test
WPS & PQR
Welder performance test
Hydrostatic test at BlDDER shop as per Code & Local Regulations, Specifications.
Installation work for vessel internals supplied by Bidder
External surface preparation and painting as per Specification
Packing and marking as per project specificationsPreservation during transportation and storage (Including Seaworthy packing for oversea manufacturer)
Internal protection from moisture: N2 Charge
All activities to meet requirements of Data Sheets, Specifications, Codes and Standards, Local Regulations