Customization: | Available |
---|---|
After-sales Service: | Repairable Within The Warranty Period |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The working principle of a vacuum diversion tank is to use the pressure difference to empty the air inside the tank through a vacuum pump, forming a vacuum state. When the tank mouth sinks into the water, due to the vacuum inside the tank, the water will automatically enter the tank without the need for external forces to divert water. When the tank mouth is lifted above the water surface, due to the pressure difference, water will be adsorbed above the tank mouth, forming a water column.
The water flow control of the diversion tank is generally achieved by controlling the gate or valve. The degree of opening and closing of the gate determines the flow rate and velocity of water flow. When the gate is fully open, the speed of water flow through the diversion tank is the highest, and the flow rate is the highest. When the gate is closed, the speed and flow of water passing through the diversion tank will decrease. By adjusting the opening and closing degree of the gate, the water flow in the diversion tank can be flexibly controlled to meet the needs of different scenarios.
SCOPE OF WORK
Mechanical and Fabrication guarantee
Design including strength calculation (including erection condition) stress analysis and detail design based on applicable Codes, Local Regulation, Project Specifications and Standards
Thermal Design (Thermal Rating)
All technical certifications required for design work as per local regulations
Stability check (during transport, lifting and hydrostatic test) and loading data for base design
Structural analysis for main body and its support for operation load
Material procurement
Material Test and Certificates as per applicable Code and Specifications
Manufacturing
Post weld heat treatment as per code and specification
PMI (Positive Material Identification)
All NDEs as per Project Specification
Welding procedure qualification test
WPS & PQR
Welder performance test
Hydrostatic test at BlDDER shop as per Code & Local Regulations, Specifications.
Installation work for vessel internals supplied by Bidder
External surface preparation and painting as per Specification
Packing and marking as per project specificationsPreservation during transportation and storage (Including Seaworthy packing for oversea manufacturer)
Internal protection from moisture: N2 Charge
All activities to meet requirements of Data Sheets, Specifications, Codes and Standards, Local Regulations