Classification and use of exhaust gas recovery tanks:
1. Tail gas collection tank: used to collect the tail gas generated in the chemical production process and introduce it into the tail gas treatment system for treatment through pipelines or other equipment to meet environmental protection and safety requirements.
2. Tail gas purification tank: used to purify the collected tail gas, remove harmful substances, pollutants, or other harmful components, in order to reduce the impact on the environment and protect personnel health and safety.
3. Tail gas storage tank: used to store the tail gas generated during the chemical production process for subsequent utilization or treatment. Storage tanks usually have a certain degree of sealing performance to prevent exhaust leakage or the entry of external substances.
4. Exhaust gas reuse tank: used to treat the collected exhaust gas and recycle its useful components or energy. For example, converting organic substances in exhaust gas into combustible gases for fuel or energy supply..
SCOPE OF WORK
Mechanical and Fabrication guarantee
Design including strength calculation (including erection condition) stress analysis and detail design based on applicable Codes, Local Regulation, Project Specifications and Standards
Thermal Design (Thermal Rating)
All technical certifications required for design work as per local regulations
Stability check (during transport, lifting and hydrostatic test) and loading data for base design
Structural analysis for main body and its support for operation load
Material procurement
Material Test and Certificates as per applicable Code and Specifications
Manufacturing
Post weld heat treatment as per code and specification
PMI (Positive Material Identification)
All NDEs as per Project Specification
Welding procedure qualification test
WPS & PQR
Welder performance test
Hydrostatic test at BlDDER shop as per Code & Local Regulations, Specifications.
Installation work for vessel internals supplied by Bidder
External surface preparation and painting as per Specification
Packing and marking as per project specificationsPreservation during transportation and storage (Including Seaworthy packing for oversea manufacturer)
Internal protection from moisture: N2 Charge
All activities to meet requirements of Data Sheets, Specifications, Codes and Standards, Local Regulations